Off Shore Silt Removal

Client: Fastnet Shipping

We supplied our 45 tonne triple boom configuration long reach excavator to Fastnet shipping where it was positioned on there 200 tonne Multicat to Excavate and remove silt at a depth of 14.5 meters below water level .

Using our Trimble earthworks positioning system enabled us to achieve accurate results cleaning the seabed required by the client.

Enquire

Contact us or give us a call for a quotation.

Our Social Media